如果公司行號有需要系統保證的專業顧問,可與本人接洽(If your company needs a professional consultant who can provide system assurance, please contact me.)

本人具有以下的工作經驗(I have the following work experience)

Job Function: System Assurance of MRT includes

-      Reliability Analysis

-      Maintainability Analysis

-      Human Factor Engineering

-      FMECA (Failure Mode, Effects and Criticality Analysis)

-      SSHA (Subsystem Hazard Analysis)

-      Operation Hazard Analysis

-      C/CIL (Critical Fatal Items List)

-      V&V (verification and validation)

The metro projects included

  1. Taipei Tamsui-Xinyi Line,
  2. Circular Line Phase 1
  3. Dan-Hai Light Rail Transit,
  4. New Taipei San-Ying Line
  5. Circular Line Phase 2

本人聯絡方式: wenchewu0810@gmail.com

創作者介紹
創作者 人生分享 的頭像
人生旅者

人生分享

人生旅者 發表在 痞客邦 留言(0) 人氣( 0 )